• We at JA Draughting take pride in our work. We have gone through the evolution of Draughting from drawing boards to new modernize 2D and 3D CAD Structural, Mechanical, Civil PR approved designs that are accurately presentable with relevant standards.

  • CLIENT -SISHEN IRON ORE 

    PROJECT – PLANNED DEWATERING OF MINNING AREA WITH BORE HOLES UP TO 400 m DEEP. THE ELECTRICAL CABLE USED TO BE UNCOILED AND RECOILED BY HAND WITH A HUGE RISK OF INJURIES TO PERSONNEL. WE WERE TASKED WITH MEGANISING THE PROCESS. OUR SOLUTION WAS A TRAILER THAT CAN COIL AND DECOIL THE CABLE OFF UP TO Ø60 x 400 m LONG. USING A PETROL ENGINE DRIVING A HYDRAULIC PUMP.

Image