• CLIENT -SISHEN IRON ORE 

    PROJECT – PLANNED DEWATERING OF MINNING AREA WITH BORE HOLES UP TO 400 m DEEP. THE ELECTRICAL CABLE USED TO BE UNCOILED AND RECOILED BY HAND WITH A HUGE RISK OF INJURIES TO PERSONNEL. WE WERE TASKED WITH MEGANISING THE PROCESS. OUR SOLUTION WAS A TRAILER THAT CAN COIL AND DECOIL THE CABLE OFF UP TO Ø60 x 400 m LONG. USING A PETROL ENGINE DRIVING A HYDRAULIC PUMP.

Image